We have pegs
The first sign of progress (how exicting), 4 red pegs. We took these photos on Saturday, apparently they were done on Monday. The front 2 are marked "3M TO INT (PORCH)". The back 2 are marked "3M TO WALL" which is referring to the retaining wall at the perimeter of our block. Not sure what the go is with 3 metres, on our plans it seems to fall in line with the sediment control fence at the back, and the temporary security fence at the front.
No comments:
Post a Comment